|
The proposed design for the Firefly Bridge Over Trail Creek has been revealed! It will bridge the 500-foot gap in the existing trail over Trail Creek at the old Trail Creek/"Murmur" trestle. The recommendation grows out of tremendous public input and detailed discussions involving multiple Athens-Clarke County departments and the Mayor and Commission. The plan is a hybrid design incorporating an exact replacement of the existing trestle with sweeping steel arches supporting new construction on each end. Check it out here https://www.accgov.com/8735/Firefly-Bridge-Over-Trail-Creek or go to Thursday's (9/18/19) open house at 6 PM at the Planning Department auditorium on Dougherty Street.
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
The Firefly Trail is a community-driven rail-trail in progress. When complete, it will stretch about 39 miles between Union Point and Athens, Ga., connecting three counties and seven towns with a wide, paved, off-road path for walking, running, cycling and rolling that celebrates the historic corridor of the Georgia Railroad Athens Branch, the state’s first chartered railroad.
INstagram | FBBlog Archives
November 2025
GIVE TO FIREFLY VIA KROGERBe sure to update your Kroger Plus to designate Firefly Trail, Inc. (Organization #BJ882) as your preferred community partner!
|